A platform for research: civil engineering, architecture and urbanism
Floating rigs, high-strength bolts cut girder bridge erection time
Erection of great Egg Bay bridge in New Jersey which involves 2730 ft of structural steel work and is part of 165-mi parkway; sections were set by derrick boat having 75 ton capacity stiff-leg derrick with 43 ft mast and 90 ft boom.
Floating rigs, high-strength bolts cut girder bridge erection time
Erection of great Egg Bay bridge in New Jersey which involves 2730 ft of structural steel work and is part of 165-mi parkway; sections were set by derrick boat having 75 ton capacity stiff-leg derrick with 43 ft mast and 90 ft boom.
Floating rigs, high-strength bolts cut girder bridge erection time
Roads Streets
Roads and Streets ; 99
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|European Patent Office | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|Bridge girder erection machine and bridging method of bridge girder erection machine
European Patent Office | 2020
|Rotary support applied to curved girder erection bridge girder erection machine
European Patent Office | 2022
|