Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New Mexico builds its first prestressed concrete bridge
Alameda bridge crossing Rio Grande River, has 19 50-ft simple spans, 26-ft roadway and is designed for H15-S12 loading; built to handle 10,000 to 15,000 vehicles per day. (See also Western Construction v 31 n 5 May 1956 p 33-5)
New Mexico builds its first prestressed concrete bridge
Alameda bridge crossing Rio Grande River, has 19 50-ft simple spans, 26-ft roadway and is designed for H15-S12 loading; built to handle 10,000 to 15,000 vehicles per day. (See also Western Construction v 31 n 5 May 1956 p 33-5)
New Mexico builds its first prestressed concrete bridge
Better Roads
Strohm, W.E. (Autor:in)
Better Roads ; 26
1956
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Mexico builds its first prestressed concrete bridge
Engineering Index Backfile | 1956
|Navy builds prestressed concrete tanks
Engineering Index Backfile | 1943
|Builds and tests prestressed-concrete trestle slab
Engineering Index Backfile | 1951
First bridge of prestressed concrete
Engineering Index Backfile | 1951
First bridge of prestressed concrete
Engineering Index Backfile | 1951