Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new railroad bridge over the Rhine at Ragaz
Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)
Construction of new railroad bridge over the Rhine at Ragaz
Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)
Construction of new railroad bridge over the Rhine at Ragaz
Der Umbau der Eisenbahnbruecke der S.B.B. ueber den Rhein bei Ragaz
Buehler, A. (Autor:in)
1928
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
All-welded railroad bridge over Rhine-Main expressway
Engineering Index Backfile | 1962
|Tamina Canyon Bridge, Bad Ragaz, Switzerland
TIBKAT | 2020
|New railroad bridge over the Rhine at Wesel
Engineering Index Backfile | 1928
|Tamina Canyon Bridge, Bad Ragaz, Switzerland
Springer Verlag | 2019
|