A platform for research: civil engineering, architecture and urbanism
Construction of new railroad bridge over the Rhine at Ragaz
Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)
Construction of new railroad bridge over the Rhine at Ragaz
Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)
Construction of new railroad bridge over the Rhine at Ragaz
Der Umbau der Eisenbahnbruecke der S.B.B. ueber den Rhein bei Ragaz
Buehler, A. (author)
1928
2 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Tamina Canyon Bridge, Bad Ragaz, Switzerland
TIBKAT | 2020
|New railroad bridge over the Rhine at Wesel
Engineering Index Backfile | 1928
|Tamina Canyon Bridge, Bad Ragaz, Switzerland
Springer Verlag | 2019
|All-welded railroad bridge over Rhine-Main expressway
Engineering Index Backfile | 1962
|