Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stiff-leg Derrick solves mud problem on St.Louis parking structure
Four-story parking garage for 571 cars was built for $1208/car; building consists of structural frame structure with high strength bolt connections and steel supported concrete floors; material storage, preparation, and hoisting had to be handled from muddy basement of structure; stiff-leg derrick with 14 ton crawler crane and 120 ft boom was installed in basement; 715 tons of structural steel was erected in 18 days of actual derrick and crane time.
Stiff-leg Derrick solves mud problem on St.Louis parking structure
Four-story parking garage for 571 cars was built for $1208/car; building consists of structural frame structure with high strength bolt connections and steel supported concrete floors; material storage, preparation, and hoisting had to be handled from muddy basement of structure; stiff-leg derrick with 14 ton crawler crane and 120 ft boom was installed in basement; 715 tons of structural steel was erected in 18 days of actual derrick and crane time.
Stiff-leg Derrick solves mud problem on St.Louis parking structure
Civ Eng (NY)
Doyne, M.I. (Autor:in)
1960
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Derrick equilateral polygonal chain type parking space
Europäisches Patentamt | 2015
|Tubular steel towers 52 ft. high carry stiff-leg Derrick
Engineering Index Backfile | 1933
|