Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Excavation for Ville Marie presents problems
Excavation caused problems in construction of Montreal's Ville Marie project; work included excavation of rock in heavily populated downtown area, and installing vital shoring in restricted site surrounded by tall buildings, railroad tracks, and busy streets; preshearing method in removing 30 ft deep rock ledge; releasing steam above each shot just before it was fired in order to refract shot and diminish intensity of noise.
Excavation for Ville Marie presents problems
Excavation caused problems in construction of Montreal's Ville Marie project; work included excavation of rock in heavily populated downtown area, and installing vital shoring in restricted site surrounded by tall buildings, railroad tracks, and busy streets; preshearing method in removing 30 ft deep rock ledge; releasing steam above each shot just before it was fired in order to refract shot and diminish intensity of noise.
Excavation for Ville Marie presents problems
Eng Contract Rec
Caplan, B. (Autor:in)
1959
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Autoroute bridge presents pier problems
Engineering Index Backfile | 1958
Ville-Marie motorway. In the heart of Montreal: rehabilitation of highway 720
British Library Online Contents | 1999
|Underground command center presents problems
Engineering Index Backfile | 1964
|Ville-Marie motorway. In the heart of Montreal: rehabilitation of highway 720 East
Online Contents | 1999
|Building above steam operation presents problems
Engineering Index Backfile | 1938