Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dokan project: flood-disposal works and grouted cut-off curtain
Spillway structure of dam; experiments on spillway models, and river diversion arrangements; two 300 m long concrete lined irrigation tunnels of 11 and 12 m diam described; grouted cutoff curtain beneath dam and on flanks; grouting work done through tunnels.
Dokan project: flood-disposal works and grouted cut-off curtain
Spillway structure of dam; experiments on spillway models, and river diversion arrangements; two 300 m long concrete lined irrigation tunnels of 11 and 12 m diam described; grouted cutoff curtain beneath dam and on flanks; grouting work done through tunnels.
Dokan project: flood-disposal works and grouted cut-off curtain
Instn Civ Engrs -- Proc
Binnie, G.M. (Autor:in) / Campbell, J.G. (Autor:in) / Gimson, N.H. (Autor:in) / Lancaster-Jones, P.F.F. (Autor:in) / Gillott, C.A. (Autor:in)
1959
24 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Dokan dam and flood disposal works in Iraq
Engineering Index Backfile | 1959
Dokan dam in Iraq-refrigeration of concrete
Engineering Index Backfile | 1961
|Cooling of Dokan dam during its construction
Engineering Index Backfile | 1960
|Grouted rock bolts for permanent support of major underground works
Engineering Index Backfile | 1963
|Sewage disposal and flood drainage equipment for water conservancy project
Europäisches Patentamt | 2021
|