A platform for research: civil engineering, architecture and urbanism
Dokan project: flood-disposal works and grouted cut-off curtain
Spillway structure of dam; experiments on spillway models, and river diversion arrangements; two 300 m long concrete lined irrigation tunnels of 11 and 12 m diam described; grouted cutoff curtain beneath dam and on flanks; grouting work done through tunnels.
Dokan project: flood-disposal works and grouted cut-off curtain
Spillway structure of dam; experiments on spillway models, and river diversion arrangements; two 300 m long concrete lined irrigation tunnels of 11 and 12 m diam described; grouted cutoff curtain beneath dam and on flanks; grouting work done through tunnels.
Dokan project: flood-disposal works and grouted cut-off curtain
Instn Civ Engrs -- Proc
Binnie, G.M. (author) / Campbell, J.G. (author) / Gimson, N.H. (author) / Lancaster-Jones, P.F.F. (author) / Gillott, C.A. (author)
1959
24 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dokan dam and flood disposal works in Iraq
Engineering Index Backfile | 1959
Dokan dam in Iraq-refrigeration of concrete
Engineering Index Backfile | 1961
|Cooling of Dokan dam during its construction
Engineering Index Backfile | 1960
|Sewage disposal and flood drainage equipment for water conservancy project
European Patent Office | 2021
|Grouted rock bolts for permanent support of major underground works
Engineering Index Backfile | 1963
|