Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of Karadj hydro-electric project
Project consists of 178 m high, 390 m long arch dam with gated spillway, and power plant within dam structure with 3 Francis turbines of 47,000 kw each at 140 m head, having 3 intakes from reservoir; it includes also downstream regulating dam and relocation of 9 mi of road; concrete construction was controlled by 160 embedded thermometers, 60 joint gages, 550 strain gages, 16 foundation deformation gages, and 21 embedded targets.
Design of Karadj hydro-electric project
Project consists of 178 m high, 390 m long arch dam with gated spillway, and power plant within dam structure with 3 Francis turbines of 47,000 kw each at 140 m head, having 3 intakes from reservoir; it includes also downstream regulating dam and relocation of 9 mi of road; concrete construction was controlled by 160 embedded thermometers, 60 joint gages, 550 strain gages, 16 foundation deformation gages, and 21 embedded targets.
Design of Karadj hydro-electric project
Indian J Power River Valley Development
Harza, R.D. (Autor:in) / Edbrooke, R.F. (Autor:in)
1960
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Engineering Index Backfile | 1959
|Engineering Index Backfile | 1949
|Engineering Index Backfile | 1964
Sharavathi hydro electric project
Engineering Index Backfile | 1966
|