Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New method of determining most economical and suitable cross section, slope, and alignment of channel which has to be routed through rough, undulating country; method enables one longitudinal section and excavation quantity determined for trial channel layout based upon it to form basis of further short excavation computations for other possible channel designs.
New method of determining most economical and suitable cross section, slope, and alignment of channel which has to be routed through rough, undulating country; method enables one longitudinal section and excavation quantity determined for trial channel layout based upon it to form basis of further short excavation computations for other possible channel designs.
Quick way of computing channel excavation
Civ Eng (Lond)
Mann, C.R. (Autor:in)
1961
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Quick closing device for subway contact channel freezing excavation protective door
Europäisches Patentamt | 2021
|Computing Pit Excavation Volume
Online Contents | 2005
|