Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
River channel excavation construction method
The invention discloses a riverway excavation construction method which comprises the steps that S1, according to a designed riverway, a plurality of construction areas are divided, and at least one excavator is distributed to each construction area; s2, according to the positions of the multiple construction areas, an earthwork transfer route is determined; s3, obtaining construction images of the plurality of construction areas by using an unmanned aerial vehicle, and estimating earthwork output of each construction area according to the construction images; and S4, according to the earthwork output of each construction area and the loading capacity of the transfer vehicles, the number of the transfer vehicles and the loading positions of the transfer vehicles on the earthwork transfer route are determined. The number of transfer vehicles can be reduced, and the construction cost is reduced.
本发明公开了河道开挖施工方法,包括:S1:根据设计河道,划分多个施工区域,每个所述施工区域至少分配一台挖掘机;S2:根据多个所述施工区域的位置,确定土方转运路线;S3:利用无人机获取多个所述施工区域的施工图像,根据所述施工图像估算各所述施工区域的土方产生量;S4:根据各所述施工区域的土方产生量、转运车辆的装载容量,确定所述转运车辆的数量和在所述土方转运路线上的装载位置。本发明能够减少转运车辆数量,降低施工成本。
River channel excavation construction method
The invention discloses a riverway excavation construction method which comprises the steps that S1, according to a designed riverway, a plurality of construction areas are divided, and at least one excavator is distributed to each construction area; s2, according to the positions of the multiple construction areas, an earthwork transfer route is determined; s3, obtaining construction images of the plurality of construction areas by using an unmanned aerial vehicle, and estimating earthwork output of each construction area according to the construction images; and S4, according to the earthwork output of each construction area and the loading capacity of the transfer vehicles, the number of the transfer vehicles and the loading positions of the transfer vehicles on the earthwork transfer route are determined. The number of transfer vehicles can be reduced, and the construction cost is reduced.
本发明公开了河道开挖施工方法,包括:S1:根据设计河道,划分多个施工区域,每个所述施工区域至少分配一台挖掘机;S2:根据多个所述施工区域的位置,确定土方转运路线;S3:利用无人机获取多个所述施工区域的施工图像,根据所述施工图像估算各所述施工区域的土方产生量;S4:根据各所述施工区域的土方产生量、转运车辆的装载容量,确定所述转运车辆的数量和在所述土方转运路线上的装载位置。本发明能够减少转运车辆数量,降低施工成本。
River channel excavation construction method
河道开挖施工方法
LEI YEQING (Autor:in)
03.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E02D
FOUNDATIONS
,
Gründungen
/
G06N
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
,
Rechnersysteme, basierend auf spezifischen Rechenmodellen
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
G06T
Bilddatenverarbeitung oder Bilddatenerzeugung allgemein
,
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
River channel excavation diversion method and cofferdam structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Mudstone section deep excavation cutting excavation construction method
Europäisches Patentamt | 2021
|