Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Controlled blasting demolishes stubborn buildings
Demolition of 100 ft elevator shaft and 7-story building on site of future Civic Center at Baltimore, Md; after first blasting, structure still stood, because steel reinforcing in basement columns was more extensive than estimated; structure rested virtually on bare steel; by unique method, structure was underpinned with timber and brick to allow cutting of steel with torches; timber and brick was subsequently blasted and structure came down.
Controlled blasting demolishes stubborn buildings
Demolition of 100 ft elevator shaft and 7-story building on site of future Civic Center at Baltimore, Md; after first blasting, structure still stood, because steel reinforcing in basement columns was more extensive than estimated; structure rested virtually on bare steel; by unique method, structure was underpinned with timber and brick to allow cutting of steel with torches; timber and brick was subsequently blasted and structure came down.
Controlled blasting demolishes stubborn buildings
Explosives Engr
Hallstead, W.F. (Autor:in)
Explosives Engineer ; 38
1960
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 1997
Uninflection and Stubborn Architecture
Online Contents | 1998
|Fighting a stubborn tunnel fire
Engineering Index Backfile | 1914
Studies of blasting near buildings
Engineering Index Backfile | 1961
|