Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Deft concreting speeds work on Huge Dome
Construction of 104 ft high 400 ft diam folded plate dome of University Assembly Hall at Champaign, Ill by using one tall crane outside and another inside; roof is carried by post-tensioned concrete ring; reinforcing steel was placed on precisely shaped form work and then crane poured low-slump light weight concrete, which was manually finished.
Deft concreting speeds work on Huge Dome
Construction of 104 ft high 400 ft diam folded plate dome of University Assembly Hall at Champaign, Ill by using one tall crane outside and another inside; roof is carried by post-tensioned concrete ring; reinforcing steel was placed on precisely shaped form work and then crane poured low-slump light weight concrete, which was manually finished.
Deft concreting speeds work on Huge Dome
Eng News-Rec
Engineering News-Record ; 167
1961
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New form system speeds concreting
Engineering Index Backfile | 1958
Efficient concreting speeds warehouse construction
Engineering Index Backfile | 1949
|Form on traveler speeds arch concreting
Engineering Index Backfile | 1948
|Changed concreting practice speeds road widening
Engineering Index Backfile | 1937
|Concreting huge tunnel elements for the Bosporus Crossing
British Library Online Contents | 2010
|