Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slipform triples rate of pour on missile base silos
It took only three months to build 41 ft diam, 161 ft deep silo for Titan ICBM project at Ellsworth Air Force Base near Rapid City, SD; rail mounted slip form moved upward at rate of 4 ft every 6 hr; construction required unusual accuracy; laterally, finished concrete could not vary more than 1/4 in. out of round vertically, it could not be more than 1/4 in. out of plumb in 10 ft.
Slipform triples rate of pour on missile base silos
It took only three months to build 41 ft diam, 161 ft deep silo for Titan ICBM project at Ellsworth Air Force Base near Rapid City, SD; rail mounted slip form moved upward at rate of 4 ft every 6 hr; construction required unusual accuracy; laterally, finished concrete could not vary more than 1/4 in. out of round vertically, it could not be more than 1/4 in. out of plumb in 10 ft.
Slipform triples rate of pour on missile base silos
Construction Methods Equipment
1960
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Slipform paver and method for operating a slipform paver
Europäisches Patentamt | 2023
|SLIPFORM PAVER AND METHOD FOR OPERATING A SLIPFORM PAVER
Europäisches Patentamt | 2019
|