Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Raising capacity of Cincinnati refuse incinerator from 300 to 400 tons at cost of $123,000.
Raising capacity of Cincinnati refuse incinerator from 300 to 400 tons at cost of $123,000.
Enlarged incinerator for queen city
Am City
Root, J.E. (Autor:in)
American City ; 51
1936
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
City of Kitchener installs modern refuse incinerator
Engineering Index Backfile | 1952
|New incinerator of city of Zurich, Switzerland
Engineering Index Backfile | 1929
|One-man incinerator for Canadian city of 18,000
Engineering Index Backfile | 1936
British Library Online Contents | 2016
|