Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Laying gas main under canal
Brief description of under-water main installed by Corporation of Grangemouth Gas Department in Stirlingshire, England; line laid in duplicate, as precautionary measure; trench cut by dredging and trimmed by divers; main assembled horizontally on punts, lifted into vertical position by cranes, and lowered into place with timber structure which gave just sufficient buoyancy; before releasing timber frame, divers packed up each joint to its correct level.
Laying gas main under canal
Brief description of under-water main installed by Corporation of Grangemouth Gas Department in Stirlingshire, England; line laid in duplicate, as precautionary measure; trench cut by dredging and trimmed by divers; main assembled horizontally on punts, lifted into vertical position by cranes, and lowered into place with timber structure which gave just sufficient buoyancy; before releasing timber frame, divers packed up each joint to its correct level.
Laying gas main under canal
Gas J
Gas Journal ; 213
1936
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
LAYING METHOD OF MAIN ROPE AND MAIN ROPE LAYING SYSTEM
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1938