A platform for research: civil engineering, architecture and urbanism
Laying gas main under canal
Brief description of under-water main installed by Corporation of Grangemouth Gas Department in Stirlingshire, England; line laid in duplicate, as precautionary measure; trench cut by dredging and trimmed by divers; main assembled horizontally on punts, lifted into vertical position by cranes, and lowered into place with timber structure which gave just sufficient buoyancy; before releasing timber frame, divers packed up each joint to its correct level.
Laying gas main under canal
Brief description of under-water main installed by Corporation of Grangemouth Gas Department in Stirlingshire, England; line laid in duplicate, as precautionary measure; trench cut by dredging and trimmed by divers; main assembled horizontally on punts, lifted into vertical position by cranes, and lowered into place with timber structure which gave just sufficient buoyancy; before releasing timber frame, divers packed up each joint to its correct level.
Laying gas main under canal
Gas J
Gas Journal ; 213
1936
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1938