Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Two bridge spans replaced in less than 18 days
How, by coordinating facilities of four of its plants, Bethlehem Steel Co completely fabricated and erected two long single-track through-girder skewed bridge spans within 17 2/3 days after receiving contract; new spans, located at west end of Reading's bridge over Susquehanna river near Sudbury, Pa.
Two bridge spans replaced in less than 18 days
How, by coordinating facilities of four of its plants, Bethlehem Steel Co completely fabricated and erected two long single-track through-girder skewed bridge spans within 17 2/3 days after receiving contract; new spans, located at west end of Reading's bridge over Susquehanna river near Sudbury, Pa.
Two bridge spans replaced in less than 18 days
Ry Age
Railway Age ; 100
1936
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Old jug bridge replaced by concrete spans
Engineering Index Backfile | 1945
Floating bridge more stable than fixed spans
Engineering Index Backfile | 1940
|Handling complete bridge spans
Engineering Index Backfile | 1909
Merchants Bridge spans history
British Library Online Contents | 1995
|Engineering Index Backfile | 1942