Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Old jug bridge replaced by concrete spans
Construction details of new bridge across Monocacy River near Frederick, Md, is of open spandrel type, composed of 3 spans; plywood forms used throughout construction.
Old jug bridge replaced by concrete spans
Construction details of new bridge across Monocacy River near Frederick, Md, is of open spandrel type, composed of 3 spans; plywood forms used throughout construction.
Old jug bridge replaced by concrete spans
Concrete
Concrete ; 53
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Two bridge spans replaced in less than 18 days
Engineering Index Backfile | 1936
Pile bridge replaced by concrete
Engineering Index Backfile | 1927
|Prestressed concrete bridge spans Humptulips river
Engineering Index Backfile | 1953
Bridge has 40-ft concrete spans
Engineering Index Backfile | 1957
Concrete ribbon bridge spans 1,500 Ft
Engineering Index Backfile | 1964