Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Preliminary survey, Dallas North Tollway
Preliminary control survey for Dallas North Tollway was expanded to include requirements of final design and construction; to meet these demands, accuracies and field procedures were modified to second order requirements; during survey unusual problems were encountered due to loss of second order control within area; using geodimeter and theodolite, and looking to "Dallas Skyline" for solution, "command position" was established on Southland Life Building for successful completion of survey.
Preliminary survey, Dallas North Tollway
Preliminary control survey for Dallas North Tollway was expanded to include requirements of final design and construction; to meet these demands, accuracies and field procedures were modified to second order requirements; during survey unusual problems were encountered due to loss of second order control within area; using geodimeter and theodolite, and looking to "Dallas Skyline" for solution, "command position" was established on Southland Life Building for successful completion of survey.
Preliminary survey, Dallas North Tollway
ASCE -- Prepr
Dougherty, W.H. (Autor:in) / Halff, A.H. (Autor:in)
ASCE Environmental Engineering Conference ; 1967
1967
15 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1997
|British Library Online Contents | 1997
|Enjoying the Scenery Along the Illinois Tollway
Online Contents | 1996
Breakthrough in Germany's privatly financed tollway program
British Library Online Contents | 2000
|