Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Abstract This paper examines the Poisson process, which has proven useful in several public sector analyses, as a model of a police patrol car breakdown process. On the basis of available patrol car breakdown data for a 1-yr period, the Poisson was found to be a good model of patrol car breakdowns in a city of approximately 175,000 population. Results of both chisquare and Kolmogorov-Smirnov tests are presented. Finally, implications of the Poisson model for maintenance facility staffing are discussed.
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Abstract This paper examines the Poisson process, which has proven useful in several public sector analyses, as a model of a police patrol car breakdown process. On the basis of available patrol car breakdown data for a 1-yr period, the Poisson was found to be a good model of patrol car breakdowns in a city of approximately 175,000 population. Results of both chisquare and Kolmogorov-Smirnov tests are presented. Finally, implications of the Poisson model for maintenance facility staffing are discussed.
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Gleason, John M. (Autor:in)
Urban Systems ; 4 ; 167-173
01.01.1979
7 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Online Contents | 1998
Traffic and patrol police platform with photovoltaic panel
Europäisches Patentamt | 2015
|Developing an online cooperative police patrol routing strategy
Online Contents | 2017
|