A platform for research: civil engineering, architecture and urbanism
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Abstract This paper examines the Poisson process, which has proven useful in several public sector analyses, as a model of a police patrol car breakdown process. On the basis of available patrol car breakdown data for a 1-yr period, the Poisson was found to be a good model of patrol car breakdowns in a city of approximately 175,000 population. Results of both chisquare and Kolmogorov-Smirnov tests are presented. Finally, implications of the Poisson model for maintenance facility staffing are discussed.
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Abstract This paper examines the Poisson process, which has proven useful in several public sector analyses, as a model of a police patrol car breakdown process. On the basis of available patrol car breakdown data for a 1-yr period, the Poisson was found to be a good model of patrol car breakdowns in a city of approximately 175,000 population. Results of both chisquare and Kolmogorov-Smirnov tests are presented. Finally, implications of the Poisson model for maintenance facility staffing are discussed.
A generating process for police patrol car breakdowns: Implications for maintenance facility staffing
Gleason, John M. (author)
Urban Systems ; 4 ; 167-173
1979-01-01
7 pages
Article (Journal)
Electronic Resource
English
Online Contents | 1998
Developing an online cooperative police patrol routing strategy
Elsevier | 2016
|Traffic and patrol police platform with photovoltaic panel
European Patent Office | 2015
|