Design and construction of river crossing tunnel beneath Tachia River, Taiwan
AbstractDue to the impact of the 1999 Chi-Chi earthquake (ML=7.3) and the following typhoon induced heavy rainfalls and floods, the tailrace tunnel of the Kukuan Hydropower Plant was severely blocked and must be realigned and rebuilt. The new tailrace tunnel is 1991m long with a 140m section passing underneath the Tachia River, where the shallowest rock cover is 3.5m. In view of the common phenomenon that weak zone developed along river channel and debris accumulated on river bed, the ground improvement from the surface to the tunnel is difficult. Therefore, a construction shaft, a water sealing pre-grouting plan and a special supporting system were designed to prevent the potential water inflow when tunneling underneath the Tachia River. In the construction phase, adequate excavation cross sections, support elements, auxiliary treatments, and water sealing grouting methods were selected to overcome the difficult ground condition encountered. The experience learned from this successful case can be a valuable reference for the design and construction of similar river crossing tunnels in the future.
Design and construction of river crossing tunnel beneath Tachia River, Taiwan
AbstractDue to the impact of the 1999 Chi-Chi earthquake (ML=7.3) and the following typhoon induced heavy rainfalls and floods, the tailrace tunnel of the Kukuan Hydropower Plant was severely blocked and must be realigned and rebuilt. The new tailrace tunnel is 1991m long with a 140m section passing underneath the Tachia River, where the shallowest rock cover is 3.5m. In view of the common phenomenon that weak zone developed along river channel and debris accumulated on river bed, the ground improvement from the surface to the tunnel is difficult. Therefore, a construction shaft, a water sealing pre-grouting plan and a special supporting system were designed to prevent the potential water inflow when tunneling underneath the Tachia River. In the construction phase, adequate excavation cross sections, support elements, auxiliary treatments, and water sealing grouting methods were selected to overcome the difficult ground condition encountered. The experience learned from this successful case can be a valuable reference for the design and construction of similar river crossing tunnels in the future.
Design and construction of river crossing tunnel beneath Tachia River, Taiwan
Liu, Hong-Shiang (Autor:in) / Shou, Keh-Jian (Autor:in) / Hou, Ping-Cheng (Autor:in) / Tsai, Chin-Fa (Autor:in)
Tunnelling and Underground Space Technology ; 25 ; 638-650
15.03.2010
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Design and construction of river crossing tunnel beneath Tachia River, Taiwan
Online Contents | 2010
|Design and construction of river crossing tunnel beneath Tachia River, Taiwan
British Library Online Contents | 2010
|River-crossing tunnel engineering waterproof construction method
Europäisches Patentamt | 2021
|Construction method for widening existing river-crossing tunnel
Europäisches Patentamt | 2023
|Pearl River Zhoutouzui Section River - crossing Tunnel Construction Limit Scour Modeling Study
DOAJ | 2007
|