Technical development for the Seikan tunnel
AbstractIn the construction of the Seikan Tunnel, because of both the great length of the tunnel and the condition of the undersea portion of it, difficulties were expected, such as the impossibility of confirming the geology of the tunnel route using reconnaissance. In order to overcome these difficulties, many techniques were developed during the construction of the Seikan Tunnel. This paper describes several examples of such techniques, including a horizontal advance boring to confirm the prior geology; the development of grouting methods oriented toward tightening the ground and sealing off the sea water; and each of the excavating techniques that were tried and failed in completing the undersea tunnel.
RésuméLors de la construction du tunnel de Seikan, on s'attenda à de nombreuses difficultés telles que l'impossibité de confirmer la ǵologie du tracé du tunnel donné par l'étape de reconnaissance; ces difficultés étaient dues à fois à la grande longueur du tunnel et aux conditions de la partie sous la mer. Afin de surmonter ces difficultés, plusiers techniques furent développées pendant la construction du tunnel de Seikan. Cet article décrit plusieurs exemples de ces techniques telles que des sondages horizontaux à l'avance pour confirmer la géologie, le développement des méthodes de cimentation visant à compresser la terre et à boucher les infiltrations d'eau de mer et, toutes les techniques d'excavation qui furent essayées et qui échouérent jusqu'à l'aboutissement du tunnel.
Technical development for the Seikan tunnel
AbstractIn the construction of the Seikan Tunnel, because of both the great length of the tunnel and the condition of the undersea portion of it, difficulties were expected, such as the impossibility of confirming the geology of the tunnel route using reconnaissance. In order to overcome these difficulties, many techniques were developed during the construction of the Seikan Tunnel. This paper describes several examples of such techniques, including a horizontal advance boring to confirm the prior geology; the development of grouting methods oriented toward tightening the ground and sealing off the sea water; and each of the excavating techniques that were tried and failed in completing the undersea tunnel.
RésuméLors de la construction du tunnel de Seikan, on s'attenda à de nombreuses difficultés telles que l'impossibité de confirmer la ǵologie du tracé du tunnel donné par l'étape de reconnaissance; ces difficultés étaient dues à fois à la grande longueur du tunnel et aux conditions de la partie sous la mer. Afin de surmonter ces difficultés, plusiers techniques furent développées pendant la construction du tunnel de Seikan. Cet article décrit plusieurs exemples de ces techniques telles que des sondages horizontaux à l'avance pour confirmer la géologie, le développement des méthodes de cimentation visant à compresser la terre et à boucher les infiltrations d'eau de mer et, toutes les techniques d'excavation qui furent essayées et qui échouérent jusqu'à l'aboutissement du tunnel.
Technical development for the Seikan tunnel
Kitamura, Akira (Autor:in)
Tunnelling and Underground Space Technology ; 1 ; 341-349
01.01.1986
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 1993
|ASCE | 2021
|Elsevier | 1986
|Test excavations for Seikan undersea tunnel
Engineering Index Backfile | 1967
Geotechnical report on the Seikan tunnel
Elsevier | 1986
|