Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintenance of the undersea section of the Seikan Tunnel
AbstractThis paper introduces the results of measurements made over a period of 14 years after the Seikan Tunnel was opened for service. Because this tunnel is a very long undersea tunnel with the length of 54 km, the necessity of clarifying the long-term behavior of the tunnel structure was recognized from the start. Various measurements are made to survey the condition of the ground and lining concrete and data thus obtained are used to assess the soundness of the tunnel structure. Judging from the data thus far obtained, the tunnel structure appears to remain in a good condition.
Maintenance of the undersea section of the Seikan Tunnel
AbstractThis paper introduces the results of measurements made over a period of 14 years after the Seikan Tunnel was opened for service. Because this tunnel is a very long undersea tunnel with the length of 54 km, the necessity of clarifying the long-term behavior of the tunnel structure was recognized from the start. Various measurements are made to survey the condition of the ground and lining concrete and data thus obtained are used to assess the soundness of the tunnel structure. Judging from the data thus far obtained, the tunnel structure appears to remain in a good condition.
Maintenance of the undersea section of the Seikan Tunnel
Ikuma, Michitsugu (Autor:in)
Tunnelling and Underground Space Technology ; 20 ; 143-149
20.10.2003
7 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
ASCE | 2021
|Maintenance of the undersea section of the Seikan Tunnel
Online Contents | 2005
|Maintenance of the undersea section of the Seikan tunnel
British Library Conference Proceedings | 2001
|Maintenance of the undersea section of the Seikan Tunnel
British Library Online Contents | 2005
|Test excavations for Seikan undersea tunnel
Engineering Index Backfile | 1967