Construction method of large-scale dredged sediment solidification/stabilization projects
The construction method of large-scale dredged sediment solidification/stabilization engineering comprises the following steps: dividing the flow state of newly mixed solidified dredged sediment; judging the flow state according to the water content of the newly mixed solidified dredged sediment;selecting construction method according to the flow state of the newly mixed solidified dredged sediment. The invention provides a method for reasonably selecting a construction method of solidified dredged sediment according to fluidity, which is proved to be simple and easy by practice and provides a decision basis for the actual construction of dgredged sediment solidification engineering. Pouring construction Early-stage rolling construction High flow state Low flow state of Early rolling plastic state tamiping compaction ofself-compacting - Power-law fluid Plastomer Bingham fluid Water content W Later rolling construction Figure 3
Construction method of large-scale dredged sediment solidification/stabilization projects
The construction method of large-scale dredged sediment solidification/stabilization engineering comprises the following steps: dividing the flow state of newly mixed solidified dredged sediment; judging the flow state according to the water content of the newly mixed solidified dredged sediment;selecting construction method according to the flow state of the newly mixed solidified dredged sediment. The invention provides a method for reasonably selecting a construction method of solidified dredged sediment according to fluidity, which is proved to be simple and easy by practice and provides a decision basis for the actual construction of dgredged sediment solidification engineering. Pouring construction Early-stage rolling construction High flow state Low flow state of Early rolling plastic state tamiping compaction ofself-compacting - Power-law fluid Plastomer Bingham fluid Water content W Later rolling construction Figure 3
Construction method of large-scale dredged sediment solidification/stabilization projects
HUANG YINGHAO (Autor:in) / DONG CHAN (Autor:in) / WANG SHUO (Autor:in) / WU MIN (Autor:in) / CHEN YONG (Autor:in) / WANG WENCHONG (Autor:in)
09.12.2021
Patent
Elektronische Ressource
Englisch