A platform for research: civil engineering, architecture and urbanism
Construction method of large-scale dredged sediment solidification/stabilization projects
The construction method of large-scale dredged sediment solidification/stabilization engineering comprises the following steps: dividing the flow state of newly mixed solidified dredged sediment; judging the flow state according to the water content of the newly mixed solidified dredged sediment;selecting construction method according to the flow state of the newly mixed solidified dredged sediment. The invention provides a method for reasonably selecting a construction method of solidified dredged sediment according to fluidity, which is proved to be simple and easy by practice and provides a decision basis for the actual construction of dgredged sediment solidification engineering. Pouring construction Early-stage rolling construction High flow state Low flow state of Early rolling plastic state tamiping compaction ofself-compacting - Power-law fluid Plastomer Bingham fluid Water content W Later rolling construction Figure 3
Construction method of large-scale dredged sediment solidification/stabilization projects
The construction method of large-scale dredged sediment solidification/stabilization engineering comprises the following steps: dividing the flow state of newly mixed solidified dredged sediment; judging the flow state according to the water content of the newly mixed solidified dredged sediment;selecting construction method according to the flow state of the newly mixed solidified dredged sediment. The invention provides a method for reasonably selecting a construction method of solidified dredged sediment according to fluidity, which is proved to be simple and easy by practice and provides a decision basis for the actual construction of dgredged sediment solidification engineering. Pouring construction Early-stage rolling construction High flow state Low flow state of Early rolling plastic state tamiping compaction ofself-compacting - Power-law fluid Plastomer Bingham fluid Water content W Later rolling construction Figure 3
Construction method of large-scale dredged sediment solidification/stabilization projects
HUANG YINGHAO (author) / DONG CHAN (author) / WANG SHUO (author) / WU MIN (author) / CHEN YONG (author) / WANG WENCHONG (author)
2021-12-09
Patent
Electronic Resource
English
Solidification and Stabilization of Lagoon Sludge and Dredged Spoils
British Library Conference Proceedings | 1994
|