Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method and construction system
A construction method using: a hydraulic shovel 2 controlled by a manual operation; and a hydraulic shovel 3 having a work machine automatic control unit that automatically controls a second work machine on the basis of the current topography and/or design topography of the construction range of a construction site 1000, and on the basis of the blade tip position of the second work machine, wherein a progress rate, which is the amount of soil moved by the hydraulic shovel 2 in relation to a target amount of soil in the construction range of the hydraulic shovel 2, is calculated, and if the progress rate is greater than or equal to a threshold value, the hydraulic shovel 2 pauses construction in the construction range, and the hydraulic shovel 3 takes over from the hydraulic shovel 2 and works in the construction range.
Construction method and construction system
A construction method using: a hydraulic shovel 2 controlled by a manual operation; and a hydraulic shovel 3 having a work machine automatic control unit that automatically controls a second work machine on the basis of the current topography and/or design topography of the construction range of a construction site 1000, and on the basis of the blade tip position of the second work machine, wherein a progress rate, which is the amount of soil moved by the hydraulic shovel 2 in relation to a target amount of soil in the construction range of the hydraulic shovel 2, is calculated, and if the progress rate is greater than or equal to a threshold value, the hydraulic shovel 2 pauses construction in the construction range, and the hydraulic shovel 3 takes over from the hydraulic shovel 2 and works in the construction range.
Construction method and construction system
ONISHI YOSHIYUKI (Autor:in) / AOKI MITSUHIRO (Autor:in) / KURIHARA MASAHIRO (Autor:in) / SHIMADA KENJIRO (Autor:in) / UCHIZONO TOYOHITO (Autor:in)
14.03.2024
Patent
Elektronische Ressource
Englisch
IPC:
E02F
Baggern
,
DREDGING
CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM WITH CONSTRUCTION MACHINES
Europäisches Patentamt | 2016
|