A platform for research: civil engineering, architecture and urbanism
Construction method and construction system
A construction method using: a hydraulic shovel 2 controlled by a manual operation; and a hydraulic shovel 3 having a work machine automatic control unit that automatically controls a second work machine on the basis of the current topography and/or design topography of the construction range of a construction site 1000, and on the basis of the blade tip position of the second work machine, wherein a progress rate, which is the amount of soil moved by the hydraulic shovel 2 in relation to a target amount of soil in the construction range of the hydraulic shovel 2, is calculated, and if the progress rate is greater than or equal to a threshold value, the hydraulic shovel 2 pauses construction in the construction range, and the hydraulic shovel 3 takes over from the hydraulic shovel 2 and works in the construction range.
Construction method and construction system
A construction method using: a hydraulic shovel 2 controlled by a manual operation; and a hydraulic shovel 3 having a work machine automatic control unit that automatically controls a second work machine on the basis of the current topography and/or design topography of the construction range of a construction site 1000, and on the basis of the blade tip position of the second work machine, wherein a progress rate, which is the amount of soil moved by the hydraulic shovel 2 in relation to a target amount of soil in the construction range of the hydraulic shovel 2, is calculated, and if the progress rate is greater than or equal to a threshold value, the hydraulic shovel 2 pauses construction in the construction range, and the hydraulic shovel 3 takes over from the hydraulic shovel 2 and works in the construction range.
Construction method and construction system
ONISHI YOSHIYUKI (author) / AOKI MITSUHIRO (author) / KURIHARA MASAHIRO (author) / SHIMADA KENJIRO (author) / UCHIZONO TOYOHITO (author)
2024-03-14
Patent
Electronic Resource
English
IPC:
E02F
Baggern
,
DREDGING
CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM WITH CONSTRUCTION MACHINES
European Patent Office | 2016
|