Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WORKING MACHINE MAINTENANCE WORK MANAGEMENT SYSTEM
To predict the service life of a working machine more accurately, and to make it possible to draw up an appropriate overhaul implementation plan at an early stage. A first service life prediction unit 311 predicts the service lives of main components such as an engine and the like, based upon their actual wear states. And a second service life prediction unit 312 predicts the service lives of the same components, based upon their cumulative load amounts An order setting unit 320 selects the ones of these two predicted service lives which are the shorter, and sets a priority order for overhaul in order of shortness of predicted service life. An overhaul schedule table generation unit 330 creates a schedule table D1 based upon this priority order. The contents of this schedule table D1 are decided upon by a judgement unit 340, and, if necessary, are corrected by a correction unit 341. And a plan creation unit 350 creates an overhaul implementation plan document D2 and the like, based upon the corrected schedule table D1a. The result of the overhaul task and the present states of components are tested, and these test results are reflected by the service life prediction units 311 and 312. 49
WORKING MACHINE MAINTENANCE WORK MANAGEMENT SYSTEM
To predict the service life of a working machine more accurately, and to make it possible to draw up an appropriate overhaul implementation plan at an early stage. A first service life prediction unit 311 predicts the service lives of main components such as an engine and the like, based upon their actual wear states. And a second service life prediction unit 312 predicts the service lives of the same components, based upon their cumulative load amounts An order setting unit 320 selects the ones of these two predicted service lives which are the shorter, and sets a priority order for overhaul in order of shortness of predicted service life. An overhaul schedule table generation unit 330 creates a schedule table D1 based upon this priority order. The contents of this schedule table D1 are decided upon by a judgement unit 340, and, if necessary, are corrected by a correction unit 341. And a plan creation unit 350 creates an overhaul implementation plan document D2 and the like, based upon the corrected schedule table D1a. The result of the overhaul task and the present states of components are tested, and these test results are reflected by the service life prediction units 311 and 312. 49
WORKING MACHINE MAINTENANCE WORK MANAGEMENT SYSTEM
SYSTEME DE GESTION D'OPERATIONS DE MAINTENANCE D'ENGIN DE CHANTIER
MIWA HIROBUMI (Autor:in) / TANINAGA TADASHI (Autor:in) / HORI KOUTAROU (Autor:in) / ICHIKAWA ICHIO (Autor:in)
12.04.2016
Patent
Elektronische Ressource
Englisch
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
B60S
SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
,
Warten, Reinigen, Instandsetzen, Unterstützen, Anheben oder Rangieren von Fahrzeugen, soweit nicht anderweitig vorgesehen
/
E02F
Baggern
,
DREDGING
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|