Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR RETROFITTING A MONORAIL GUIDE BEAM AND RETROFITTED MONORAIL GUIDE BEAM
A method of retrofitting an existing guide beam of an existing guideway to accept a second model of monorail. The method comprises installing a second top running surface above an existing top running surface of an existing guide beam of the existing guideway. The second top running surface is adapted to receive a load wheel of a second model of monorail. The second top running surface is installed at height H above the existing top running surface so that a second passenger floor level of the second model of monorail substantially corresponds to a first passenger floor level of an existing model of monorail supported by the existing top running surface.
Une méthode de rénovation dun montant guide dune rainure de guidage existante pour admettre un deuxième modèle de monorail. La méthode comprend linstallation dune deuxième bande de roulement sur une bande de roulement existante dun montant guide existant de la rainure de guidage existante. La deuxième bande de roulement est conçue pour recevoir une roue porteuse dun deuxième modèle de monorail. La deuxième bande de roulement est installée à la hauteur H par-dessus la bande de roulement existante, de sorte quun deuxième niveau de varangue du deuxième modèle de monorail corresponde essentiellement au premier niveau de varangue dun modèle existant de monorail soutenu par la bande de roulement existante.
METHOD FOR RETROFITTING A MONORAIL GUIDE BEAM AND RETROFITTED MONORAIL GUIDE BEAM
A method of retrofitting an existing guide beam of an existing guideway to accept a second model of monorail. The method comprises installing a second top running surface above an existing top running surface of an existing guide beam of the existing guideway. The second top running surface is adapted to receive a load wheel of a second model of monorail. The second top running surface is installed at height H above the existing top running surface so that a second passenger floor level of the second model of monorail substantially corresponds to a first passenger floor level of an existing model of monorail supported by the existing top running surface.
Une méthode de rénovation dun montant guide dune rainure de guidage existante pour admettre un deuxième modèle de monorail. La méthode comprend linstallation dune deuxième bande de roulement sur une bande de roulement existante dun montant guide existant de la rainure de guidage existante. La deuxième bande de roulement est conçue pour recevoir une roue porteuse dun deuxième modèle de monorail. La deuxième bande de roulement est installée à la hauteur H par-dessus la bande de roulement existante, de sorte quun deuxième niveau de varangue du deuxième modèle de monorail corresponde essentiellement au premier niveau de varangue dun modèle existant de monorail soutenu par la bande de roulement existante.
METHOD FOR RETROFITTING A MONORAIL GUIDE BEAM AND RETROFITTED MONORAIL GUIDE BEAM
METHODE DE RENOVATION D'UN MONTANT GUIDE DE MONORAIL ET MONTANT GUIDE DE MONORAIL RENOVE
TIMAN PETER (Autor:in)
21.01.2020
Patent
Elektronische Ressource
Englisch