Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Recursive stair type construction method for fabricated multi-layer building
The invention relates to a recursive stair type construction method for a fabricated multi-layer building. The method includes the steps of firstly, assembling a first set of walls on the ground, and conducting grouting connection on the first set of wall bodies; secondly, assembling a second set of walls on the side portions of the first set of wall bodies, and conducting grouting connection on the second set of wall bodies; thirdly, assembling floors on the first set of walls where grouting connection has been completed, assembling a third set of walls on the tops of the first set of walls, and conducting grouting connection on the third set of walls; fourthly, assembling floors on the second set of walls where grouting connection has been completed, assembling a fourth set of walls on the tops of the second set of walls, conducting grouting connection on the fourth set of walls, and repeatedly executing the third step and the fourth step till the designed layer height is achieved. The assembly construction of the multi-layer building is conducted through the recursive stair type hoisting method, the construction procedures are reasonably and alternately conducted, and the construction time is effectively saved. By means of the construction method, the work efficiency is greatly improved, the construction cost is reduced, and the construction period is shortened.
Recursive stair type construction method for fabricated multi-layer building
The invention relates to a recursive stair type construction method for a fabricated multi-layer building. The method includes the steps of firstly, assembling a first set of walls on the ground, and conducting grouting connection on the first set of wall bodies; secondly, assembling a second set of walls on the side portions of the first set of wall bodies, and conducting grouting connection on the second set of wall bodies; thirdly, assembling floors on the first set of walls where grouting connection has been completed, assembling a third set of walls on the tops of the first set of walls, and conducting grouting connection on the third set of walls; fourthly, assembling floors on the second set of walls where grouting connection has been completed, assembling a fourth set of walls on the tops of the second set of walls, conducting grouting connection on the fourth set of walls, and repeatedly executing the third step and the fourth step till the designed layer height is achieved. The assembly construction of the multi-layer building is conducted through the recursive stair type hoisting method, the construction procedures are reasonably and alternately conducted, and the construction time is effectively saved. By means of the construction method, the work efficiency is greatly improved, the construction cost is reduced, and the construction period is shortened.
Recursive stair type construction method for fabricated multi-layer building
WANG BIN (Autor:in) / SUN ZHENYU (Autor:in) / HUANG WEI (Autor:in) / WANG XIAOLIN (Autor:in) / AN JIAQIANG (Autor:in) / ZHOU GUANGYI (Autor:in) / BAI YU (Autor:in) / ZHANG SHIPENG (Autor:in) / WANG JIABIN (Autor:in) / ZHANG ZHENZHONG (Autor:in)
22.04.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated stair, construction method applying fabricated stair and building structure
Europäisches Patentamt | 2022
|Fabricated fully-prefabricated stair and fabricated stair building
Europäisches Patentamt | 2021
|