Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile frame and installation method of pile frame
The invention discloses a pile frame and an installation method of the pile frame. The crawler-type pile frame mainly comprises a chassis (1) with a crawler walking device, a machine body (2), a stand column (3), a slant support (4) and a power hydraulic system (5). One end of a linear frame (6) and one end of a jacking oil cylinder (7) are hinged to the machine body (2). The slant support (4), the linear frame (6) and the jacking oil cylinder (7) are hinged to one point to be hinged to the stand column (3) and the machine body (2). Two or more oil cylinders move in a combined mode to carry out mast erecting, and a user does not need to drive a pulley set in a winching mode to carry out mast erecting and also does not need a crane. According to the crawl-type pile frame, the whole mast erecting process is safe, stable, simple and efficient.
Pile frame and installation method of pile frame
The invention discloses a pile frame and an installation method of the pile frame. The crawler-type pile frame mainly comprises a chassis (1) with a crawler walking device, a machine body (2), a stand column (3), a slant support (4) and a power hydraulic system (5). One end of a linear frame (6) and one end of a jacking oil cylinder (7) are hinged to the machine body (2). The slant support (4), the linear frame (6) and the jacking oil cylinder (7) are hinged to one point to be hinged to the stand column (3) and the machine body (2). Two or more oil cylinders move in a combined mode to carry out mast erecting, and a user does not need to drive a pulley set in a winching mode to carry out mast erecting and also does not need a crane. According to the crawl-type pile frame, the whole mast erecting process is safe, stable, simple and efficient.
Pile frame and installation method of pile frame
QIAN HUANYUN (Autor:in) / CHEN ZILIN (Autor:in) / SHI XIAOHUI (Autor:in) / LI HAIJIAN (Autor:in) / DENG CHAO (Autor:in) / LIU JINXUE (Autor:in) / ZENG SU (Autor:in) / ZHANG FENG (Autor:in)
13.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Connecting joint, construction pile frame and installation method of construction pile frame
Europäisches Patentamt | 2023
|Prefabricated pile installation construction guide frame
Europäisches Patentamt | 2023
|Pile driving without pile frame
Engineering Index Backfile | 1942
|