Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Operation to be carried out consisted of driving of 6-in. by 6-in. timber piles ranging, according to ground conditions, from 18 ft to 26 ft in length, to form main support for new revetment of badly eroded river bank; description of methods and equipment used in completing job.
Operation to be carried out consisted of driving of 6-in. by 6-in. timber piles ranging, according to ground conditions, from 18 ft to 26 ft in length, to form main support for new revetment of badly eroded river bank; description of methods and equipment used in completing job.
Pile driving without pile frame
Instn Civ Engrs -- J
Pearson, S. (Autor:in)
1942
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pile driving barge pile frame pile reversing mechanism and working method thereof
Europäisches Patentamt | 2024
|Pile driving barge pile frame system and control method
Europäisches Patentamt | 2024
|Pile frame jacking device of pile driving barge, and pile frame jacking and lying method
Europäisches Patentamt | 2020
|