Device and method for closure construction of girder side span of cable-stayed bridge
The invention discloses a device and a method for closure construction of a girder side span of a cable-stayed bridge and relates to the field of construction of cable-stayed bridges. The device comprises a cable drawing hanging basket, a pier top support system and a cantilever outrigger, wherein the cable drawing hanging basket is arranged at the bottom of a cast girder, the pier top support system is arranged at the top of a side span closure section pier, and the cantilever outrigger is arranged at the top of the cast girder and above the pier top support system and the cable drawing hanging basket. The cable drawing hanging basket comprises two arc-shaped heads, and a transverse limit fixed pulley is welded on the outer side of each arc-shaped head and fixed on the outer side of the side span closure pier. The pier top support system comprises a first support, a second support, a plurality of first sand boxes and second sand boxes at the top of the side span closure section pier, and the outer portions of the first support and the second support are sleeved with support cover plates. The cast-in-situ section and the cast girder body are freely and synchronously telescopic, and construction cost is reduced.
Device and method for closure construction of girder side span of cable-stayed bridge
The invention discloses a device and a method for closure construction of a girder side span of a cable-stayed bridge and relates to the field of construction of cable-stayed bridges. The device comprises a cable drawing hanging basket, a pier top support system and a cantilever outrigger, wherein the cable drawing hanging basket is arranged at the bottom of a cast girder, the pier top support system is arranged at the top of a side span closure section pier, and the cantilever outrigger is arranged at the top of the cast girder and above the pier top support system and the cable drawing hanging basket. The cable drawing hanging basket comprises two arc-shaped heads, and a transverse limit fixed pulley is welded on the outer side of each arc-shaped head and fixed on the outer side of the side span closure pier. The pier top support system comprises a first support, a second support, a plurality of first sand boxes and second sand boxes at the top of the side span closure section pier, and the outer portions of the first support and the second support are sleeved with support cover plates. The cast-in-situ section and the cast girder body are freely and synchronously telescopic, and construction cost is reduced.
Device and method for closure construction of girder side span of cable-stayed bridge
ZHANG HAIYAN (Autor:in) / JIANG XIONG (Autor:in) / LYU XINYANG (Autor:in) / ZHENG JIE (Autor:in) / YANG LINBAO (Autor:in) / WANG ZEAN (Autor:in) / WANG WEI (Autor:in) / LI LEI (Autor:in) / WANG CHAO (Autor:in) / SUN ZHENG (Autor:in)
20.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Asymmetric load steel truss girder cable-stayed bridge side span closure construction control method
Europäisches Patentamt | 2024
|Cable-stayed bridge side span pushing closure construction method
Europäisches Patentamt | 2021
|Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
Europäisches Patentamt | 2015
|Installation method of span steel truss girder of cable-stayed bridge side
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|