Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Roadbed filling construction method
The invention relates to the field of building construction, in particular to a roadbed filling construction method. The roadbed filling construction method provided by the invention comprises the following steps of (1) checking a roadbed filling construction field according to a designed cross section; (2) making a filling compaction test section, determining construction parameter information through a test section wireless sensor group arranged in the roadbed filling construction field test section, and uploading the construction parameter information to a project quality control center through a wireless communication network, wherein the project quality control center determines a roadbed filling construction process according to the construction parameter information; (3) according to the roadbed filling construction process, filling each layer, wherein a layered wireless sensor group is buried in the filling process of each layer; (4) leveling a roadbed surface by a land leveler or a bulldozer in a scraping way, and filling and tamping an existing sinking by using a filler the same as the material of the roadbed surface. The invention provides the novel roadbed filling construction method; the construction quality and the maintenance of roadbed filling can be effectively improved; the construction efficiency is improved, and the roadbed change state can be timely monitored, so that the operation of a high-speed railway is protected to the greatest degree.
Roadbed filling construction method
The invention relates to the field of building construction, in particular to a roadbed filling construction method. The roadbed filling construction method provided by the invention comprises the following steps of (1) checking a roadbed filling construction field according to a designed cross section; (2) making a filling compaction test section, determining construction parameter information through a test section wireless sensor group arranged in the roadbed filling construction field test section, and uploading the construction parameter information to a project quality control center through a wireless communication network, wherein the project quality control center determines a roadbed filling construction process according to the construction parameter information; (3) according to the roadbed filling construction process, filling each layer, wherein a layered wireless sensor group is buried in the filling process of each layer; (4) leveling a roadbed surface by a land leveler or a bulldozer in a scraping way, and filling and tamping an existing sinking by using a filler the same as the material of the roadbed surface. The invention provides the novel roadbed filling construction method; the construction quality and the maintenance of roadbed filling can be effectively improved; the construction efficiency is improved, and the roadbed change state can be timely monitored, so that the operation of a high-speed railway is protected to the greatest degree.
Roadbed filling construction method
XI HAO (Autor:in) / LIANG GUOHUI (Autor:in) / ZHANG WEIJUN (Autor:in) / CAI SHENGCHEN (Autor:in) / QI XIONG (Autor:in) / ZHENG MAOSHENG (Autor:in) / SONG FENGFENG (Autor:in) / ZHENG YU (Autor:in)
27.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Roadbed filling construction device and construction method
Europäisches Patentamt | 2024
|