Method for open-air arrangement of main plant of fuel gas-steam combined-cycle power plant
The invention relates to an open-air distributing structure of a main plant of a thermal power plant, in particular to a method for open-air arrangement of the main plant of a fuel gas-steam combined-cycle power plant. The method has the key points that the open-air arrangement is carried out by adopting cover shells by gas turbines and gas turbine generators in a gas turbine generator unit, other auxiliary devices adopt a container form to carry out concentrated open-air arrangement at one side, which is close to the corresponding gas turbine and gas turbine generator, of each of the other auxiliary devices, and a passage is reserved at the other side of each auxiliary device to be used for an overhauling crane to stop. According to the method disclosed by the invention, a steam turbine is in high-position arrangement, downward steam discharging is adopted, buildings above a running layer are removed by a steam turbine room, and a floor slab of the running layer is used as a top cover of the steam turbine room; a gantry crane or an automobile crane is adopted, thus the works of installing and civil engineering can be simultaneously carried out or can be orderly carried out in a crossing way, the construction period is shortened, building materials are saved, the construction cost is reduced, and the running cost of heating, ventilation and air conditioning is effectively reduced.
Method for open-air arrangement of main plant of fuel gas-steam combined-cycle power plant
The invention relates to an open-air distributing structure of a main plant of a thermal power plant, in particular to a method for open-air arrangement of the main plant of a fuel gas-steam combined-cycle power plant. The method has the key points that the open-air arrangement is carried out by adopting cover shells by gas turbines and gas turbine generators in a gas turbine generator unit, other auxiliary devices adopt a container form to carry out concentrated open-air arrangement at one side, which is close to the corresponding gas turbine and gas turbine generator, of each of the other auxiliary devices, and a passage is reserved at the other side of each auxiliary device to be used for an overhauling crane to stop. According to the method disclosed by the invention, a steam turbine is in high-position arrangement, downward steam discharging is adopted, buildings above a running layer are removed by a steam turbine room, and a floor slab of the running layer is used as a top cover of the steam turbine room; a gantry crane or an automobile crane is adopted, thus the works of installing and civil engineering can be simultaneously carried out or can be orderly carried out in a crossing way, the construction period is shortened, building materials are saved, the construction cost is reduced, and the running cost of heating, ventilation and air conditioning is effectively reduced.
Method for open-air arrangement of main plant of fuel gas-steam combined-cycle power plant
CHEN XIAOCHEN (Autor:in) / ZHUANG FACHENG (Autor:in) / ZHANG PENG (Autor:in) / CHEN YINMI (Autor:in) / YU JIANZHONG (Autor:in) / CHEN DUANYING (Autor:in) / ZHENG YUN (Autor:in) / ZHENG MIN (Autor:in) / ZHONG WANGYUAN (Autor:in)
27.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Gas-steam combined cycle main power house arrangement structure
Europäisches Patentamt | 2024
|Main power house structure of gas-steam combined cycle power plant
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Main power house arrangement structure of single-shaft gas-steam combined cycle generator set
Europäisches Patentamt | 2022
|Thermal control arrangement structure of gas-steam combined cycle heat supply unit plant
Europäisches Patentamt | 2021
|