Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gas-steam combined cycle main power house arrangement structure
The invention belongs to the technical field of power plant arrangement, and provides a gas-steam combined cycle main power house arrangement structure which comprises a gas turbine, a gas turbine generator, a waste heat boiler, a steam turbine and a steam turbine generator. The gas turbine is connected with the gas turbine generator, and the steam turbine is connected with the steam turbine generator; the gas turbine and the waste heat boiler are both arranged outdoors, and the steam turbine is arranged indoors. The gas turbine, the waste heat boiler and the steam turbine are integrally arranged in a delta shape, and the gas-steam combined cycle main power house arrangement structure is integrally arranged in an axial symmetry structure. According to the invention, the main workshop is compact in arrangement, clear in function division and sufficient in space utilization.
本发明属于电厂布置技术领域,提供了一种燃气‑蒸汽联合循环主厂房布置结构,其包括燃气轮机、燃机发电机、余热锅炉、汽轮机以及汽轮发电机;所述燃气轮机与燃机发电机相连,所述汽轮机与汽轮发电机相连;所述燃气轮机及余热锅炉均采用露天布置,所述汽轮机采用室内布置;所述燃气轮机、余热锅炉及汽轮机整体呈品字形布置,且所述燃气‑蒸汽联合循环主厂房布置结构整体呈轴对称结构布置。其能够使得主厂房布置紧凑,功能分区明确,空间利用充分。
Gas-steam combined cycle main power house arrangement structure
The invention belongs to the technical field of power plant arrangement, and provides a gas-steam combined cycle main power house arrangement structure which comprises a gas turbine, a gas turbine generator, a waste heat boiler, a steam turbine and a steam turbine generator. The gas turbine is connected with the gas turbine generator, and the steam turbine is connected with the steam turbine generator; the gas turbine and the waste heat boiler are both arranged outdoors, and the steam turbine is arranged indoors. The gas turbine, the waste heat boiler and the steam turbine are integrally arranged in a delta shape, and the gas-steam combined cycle main power house arrangement structure is integrally arranged in an axial symmetry structure. According to the invention, the main workshop is compact in arrangement, clear in function division and sufficient in space utilization.
本发明属于电厂布置技术领域,提供了一种燃气‑蒸汽联合循环主厂房布置结构,其包括燃气轮机、燃机发电机、余热锅炉、汽轮机以及汽轮发电机;所述燃气轮机与燃机发电机相连,所述汽轮机与汽轮发电机相连;所述燃气轮机及余热锅炉均采用露天布置,所述汽轮机采用室内布置;所述燃气轮机、余热锅炉及汽轮机整体呈品字形布置,且所述燃气‑蒸汽联合循环主厂房布置结构整体呈轴对称结构布置。其能够使得主厂房布置紧凑,功能分区明确,空间利用充分。
Gas-steam combined cycle main power house arrangement structure
一种燃气-蒸汽联合循环主厂房布置结构
LYU YUHONG (Autor:in) / LI HONGCHAO (Autor:in) / ZHANG TAO (Autor:in) / QI JINSHENG (Autor:in) / LI LIN (Autor:in) / WANG YUZHE (Autor:in) / SHANG LIANG (Autor:in) / SU WEI (Autor:in) / TIAN LIN (Autor:in) / MA QIANG (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Main power house arrangement structure of single-shaft gas-steam combined cycle generator set
Europäisches Patentamt | 2022
|Main power house structure of gas-steam combined cycle power plant
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Method for open-air arrangement of main plant of fuel gas-steam combined-cycle power plant
Europäisches Patentamt | 2015
|Thermal control arrangement structure of gas-steam combined cycle heat supply unit plant
Europäisches Patentamt | 2021
|