Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete curing construction method and curing device
The invention discloses a concrete curing construction method, comprising the steps: 1, after dismantling a poured concrete formwork, wrapping the outer surface of concrete by geotechnical cloth, and watering the geotechnical cloth to saturate the geotechnical cloth; 2, wrapping a rubber and plastic plate outside the geotechnical cloth, sealing a joint of the rubber and plastic plate, and firmly bundling or firmly fixing by pressing with a sand bag; 3, according to a preset interval, arranging moisturizing pipes, penetrating through the rubber and plastic plate, on the upper surface of the rubber and plastic plate; 4, moisturizing the geotechnical cloth by the moisturizing pipes every 4 to 6 days in a curing period, so as to ensure the wet surface of the concrete. The invention also discloses a curing device of the method. The concept is ingenious, the method is simple, the harm of weather conditions, such as high temperature, drought, large temperature difference and high wind in an inland gobi area, to curing the high performance concrete is overcome, thermal insulation and moisture retention are achieved, and used water and material consumption are reduced.
Concrete curing construction method and curing device
The invention discloses a concrete curing construction method, comprising the steps: 1, after dismantling a poured concrete formwork, wrapping the outer surface of concrete by geotechnical cloth, and watering the geotechnical cloth to saturate the geotechnical cloth; 2, wrapping a rubber and plastic plate outside the geotechnical cloth, sealing a joint of the rubber and plastic plate, and firmly bundling or firmly fixing by pressing with a sand bag; 3, according to a preset interval, arranging moisturizing pipes, penetrating through the rubber and plastic plate, on the upper surface of the rubber and plastic plate; 4, moisturizing the geotechnical cloth by the moisturizing pipes every 4 to 6 days in a curing period, so as to ensure the wet surface of the concrete. The invention also discloses a curing device of the method. The concept is ingenious, the method is simple, the harm of weather conditions, such as high temperature, drought, large temperature difference and high wind in an inland gobi area, to curing the high performance concrete is overcome, thermal insulation and moisture retention are achieved, and used water and material consumption are reduced.
Concrete curing construction method and curing device
LI GUANGQING (Autor:in) / ZHANG CHUAN AN (Autor:in) / LI PENGFEI (Autor:in) / GONG YANLIANG (Autor:in)
03.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Building construction concrete curing device and curing method thereof
Europäisches Patentamt | 2023
|