Water-stopping curtain construction method
The invention relates to the field of building construction, in particular to a water-stopping curtain and a construction method thereof. The water-stopping curtain construction method provided by the invention is characterized in that the method comprises the steps of 1) leveling a construction area and marking hole drilling positions according to a design drawing; 2) enabling a drilling machine to enter the construction area to perform construction, wherein the inclination of the drilling machine is required to be smaller than 1 percent; 3) immediately replacing mud in a drilled hole with a shelling material through a drill rod after the drilled hole is formed; 4) immediately inserting a sleeve valve pipe after replacement is completed, and lowering the sleeve valve pipe into the drilled hole till the sleeve valve pipe reaches the bottom of the drilled hole; 5) after at least 24 hours after the completion of the replacement step, grouting through a grouting inner pipe inserted into the sleeve valve pipe, and paying close attention to change of grouting pressure during grouting; 6) after grouting, sealing and protecting the mouth of the drilled hole by using a plug. The water-stopping curtain construction method provided by the invention can guarantee the water-stopping quality, effectively avoid the abnormal situations such as grout leaking and accelerate the construction progress.
Water-stopping curtain construction method
The invention relates to the field of building construction, in particular to a water-stopping curtain and a construction method thereof. The water-stopping curtain construction method provided by the invention is characterized in that the method comprises the steps of 1) leveling a construction area and marking hole drilling positions according to a design drawing; 2) enabling a drilling machine to enter the construction area to perform construction, wherein the inclination of the drilling machine is required to be smaller than 1 percent; 3) immediately replacing mud in a drilled hole with a shelling material through a drill rod after the drilled hole is formed; 4) immediately inserting a sleeve valve pipe after replacement is completed, and lowering the sleeve valve pipe into the drilled hole till the sleeve valve pipe reaches the bottom of the drilled hole; 5) after at least 24 hours after the completion of the replacement step, grouting through a grouting inner pipe inserted into the sleeve valve pipe, and paying close attention to change of grouting pressure during grouting; 6) after grouting, sealing and protecting the mouth of the drilled hole by using a plug. The water-stopping curtain construction method provided by the invention can guarantee the water-stopping quality, effectively avoid the abnormal situations such as grout leaking and accelerate the construction progress.
Water-stopping curtain construction method
XI HAO (Autor:in) / LIANG GUOHUI (Autor:in) / ZHANG WEIJUN (Autor:in) / CAI SHENGCHEN (Autor:in) / QI XIONG (Autor:in) / ZHENG MAOSHENG (Autor:in) / REN PEILIN (Autor:in) / LU ZHIGANG (Autor:in)
03.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of mine pit slope water gushing and water stopping flexible curtain wall
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|