Grouting method for middle embedded grouting water stop belt
The invention relates to the field of buildings and discloses a grouting method for a middle embedded grouting water stop belt. The grouting method comprises the steps that the middle embedded grouting water stop belt is installed at the pipe joint seam of two adjacent concrete members, pre-embedded grouting pipes are arranged on the two sides of the middle embedded grouting water stop belt respectively, and a plurality of grouting guide pipes communicated with the pre-embedded grouting pipes are arranged; grouting is started from the first grouting guide pipe and is stopped when grout comes out of the second grouting guide pipe adjacent to the first grouting guide pipe and the third grouting guide pipe, the first grouting guide pipe is sealed at the moment, then grouting is started from the second grouting guide pipe and the third grouting guide pipe, and the second grouting guide pipe and the third grouting guide pipe are sealed when grout comes out of the fourth grouting guide pipe adjacent to the second grouting guide pipe and the fifth grouting guide pipe adjacent to the third grouting guide pipe, the rest is done in the same manner until grout comes out of the last grouting guide pipe, and grouting is stopped. According to the grouting method, the grouting effect is good, the grout utilization rate is high, and construction is simple.
Grouting method for middle embedded grouting water stop belt
The invention relates to the field of buildings and discloses a grouting method for a middle embedded grouting water stop belt. The grouting method comprises the steps that the middle embedded grouting water stop belt is installed at the pipe joint seam of two adjacent concrete members, pre-embedded grouting pipes are arranged on the two sides of the middle embedded grouting water stop belt respectively, and a plurality of grouting guide pipes communicated with the pre-embedded grouting pipes are arranged; grouting is started from the first grouting guide pipe and is stopped when grout comes out of the second grouting guide pipe adjacent to the first grouting guide pipe and the third grouting guide pipe, the first grouting guide pipe is sealed at the moment, then grouting is started from the second grouting guide pipe and the third grouting guide pipe, and the second grouting guide pipe and the third grouting guide pipe are sealed when grout comes out of the fourth grouting guide pipe adjacent to the second grouting guide pipe and the fifth grouting guide pipe adjacent to the third grouting guide pipe, the rest is done in the same manner until grout comes out of the last grouting guide pipe, and grouting is stopped. According to the grouting method, the grouting effect is good, the grout utilization rate is high, and construction is simple.
Grouting method for middle embedded grouting water stop belt
ZHOU GUANGQIANG (Autor:in) / FAN CHONG (Autor:in) / TANG SONG (Autor:in) / WEI CHAOSHUAI (Autor:in) / WANG LI (Autor:in) / CHEN WEIBIN (Autor:in) / MENG QINGLONG (Autor:in)
17.06.2015
Patent
Elektronische Ressource
Englisch