Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a temporary passing bridge for construction. The temporary passing bridge comprises a first bridge body, a second bridge body and a third bridge body. The upper end of the first bridge body, the upper end of the second bridge body and the upper end of the third bridge body are provide with passing flat plates. The bottom of the first bridge body and the bottom of the third bridge body are provided with lead screw nut drill bit devices. The left end of the first bridge body and the right end of the third bridge body are both provided with a hand-operated type lead screw nut pulling device. Each lead screw nut drill bit device comprises a first lead screw nut pair with the bottom provided with a drill bit. The upper end of each first lead screw nut pair is provided with an electric motor device enabling the first lead screw nut pair to advance, stretch and retract. Each hand-operated type lead screw nut drilling device comprises a groove. Cross plates are arranged in the grooves, wherein the bottom of each cross plate is provided with a corresponding hand-operated type lead screw nut pair. The movable end of each cross plate is provided with a bolt fixing hole. According to the temporary passing bridge, through splicing and transverse and a longitudinal lead screw nut system, the installation mode of the bridge and the connecting mode between the bridge and a river bed can be greatly simplified, and the temporary passing bridge is safe and firm.
The invention discloses a temporary passing bridge for construction. The temporary passing bridge comprises a first bridge body, a second bridge body and a third bridge body. The upper end of the first bridge body, the upper end of the second bridge body and the upper end of the third bridge body are provide with passing flat plates. The bottom of the first bridge body and the bottom of the third bridge body are provided with lead screw nut drill bit devices. The left end of the first bridge body and the right end of the third bridge body are both provided with a hand-operated type lead screw nut pulling device. Each lead screw nut drill bit device comprises a first lead screw nut pair with the bottom provided with a drill bit. The upper end of each first lead screw nut pair is provided with an electric motor device enabling the first lead screw nut pair to advance, stretch and retract. Each hand-operated type lead screw nut drilling device comprises a groove. Cross plates are arranged in the grooves, wherein the bottom of each cross plate is provided with a corresponding hand-operated type lead screw nut pair. The movable end of each cross plate is provided with a bolt fixing hole. According to the temporary passing bridge, through splicing and transverse and a longitudinal lead screw nut system, the installation mode of the bridge and the connecting mode between the bridge and a river bed can be greatly simplified, and the temporary passing bridge is safe and firm.
Temporary passing bridge for municipal canal transformation
Europäisches Patentamt | 2022
|Temporary device for passing at bridge expansion joint
Europäisches Patentamt | 2021
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
Europäisches Patentamt | 2023
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
Europäisches Patentamt | 2020
|