Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place construction process for inter-pile board wall between slide-resistant piles
The invention discloses a cast-in-place construction process for an inter-pile board wall between slide-resistant piles. The inter-pile board wall to be constructed is located between the two adjacent slide-resistant piles. The process includes the steps that firstly, construction surveying is performed; secondly, construction of the slide-resistant piles is performed, wherein the two slide-resistant piles are constructed respectively; thirdly, excavation of inter-pile soil is performed, wherein the soil between the two slide-resistant piles is excavated in multiple layers from top to bottom; fourthly, an inverted filter is stacked on the rear side of the inter-pile board wall to be constructed; fifthly, cast-in-place construction of the inter-pile board wall is performed, wherein a steel reinforcement framework formed by splicing multiple steel reinforcement cages from bottom to top is arranged in the inter-pile board wall to be constructed, multiple drainage hole reserved tubes are arranged in each steel reinforcement cage, and the construction process of the inter-pile board wall to be constructed includes the steps of steel reinforcement framework binding, drainage hole reserved tube laying, formwork erection and concrete pouring. The steps of the process are simple, and the process is reasonable in design, convenient to implement, high in construction efficiency, good in construction effect and capable of solving various problems existing in an existing cast-in-place construction method for the inter-pile board wall between the slide-resistant piles.
Cast-in-place construction process for inter-pile board wall between slide-resistant piles
The invention discloses a cast-in-place construction process for an inter-pile board wall between slide-resistant piles. The inter-pile board wall to be constructed is located between the two adjacent slide-resistant piles. The process includes the steps that firstly, construction surveying is performed; secondly, construction of the slide-resistant piles is performed, wherein the two slide-resistant piles are constructed respectively; thirdly, excavation of inter-pile soil is performed, wherein the soil between the two slide-resistant piles is excavated in multiple layers from top to bottom; fourthly, an inverted filter is stacked on the rear side of the inter-pile board wall to be constructed; fifthly, cast-in-place construction of the inter-pile board wall is performed, wherein a steel reinforcement framework formed by splicing multiple steel reinforcement cages from bottom to top is arranged in the inter-pile board wall to be constructed, multiple drainage hole reserved tubes are arranged in each steel reinforcement cage, and the construction process of the inter-pile board wall to be constructed includes the steps of steel reinforcement framework binding, drainage hole reserved tube laying, formwork erection and concrete pouring. The steps of the process are simple, and the process is reasonable in design, convenient to implement, high in construction efficiency, good in construction effect and capable of solving various problems existing in an existing cast-in-place construction method for the inter-pile board wall between the slide-resistant piles.
Cast-in-place construction process for inter-pile board wall between slide-resistant piles
LI YULONG (Autor:in) / YANG JUNQIANG (Autor:in) / ZHANG ZHIYUE (Autor:in) / LI CAILIAN (Autor:in) / CHEN GUOLIANG (Autor:in) / XIE BAOJIN (Autor:in) / CHEN YUXIANG (Autor:in)
24.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|WALL STRUCTURE CONSTRUCTION METHOD USING CAST IN PLACE PILES
Europäisches Patentamt | 2023
|Pile-wall integrated prestressed cast-in-place pile construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|