Construction method for reserving water feed pipe grooves in prefabricated shear wall
The invention provides a construction method for reserving water feed pipe grooves in a prefabricated shear wall. The method includes the following steps of firstly, manufacturing a trapezoid component (2); secondly, wrapping a layer of draft paper or plastic paper (1) on the outer side of the trapezoid component (2) for standby application; thirdly, placing a reinforcing steel bar framework (4) on a shear wall body (6) after the reinforcing steel bar framework (4) is manufactured, placing the trapezoid component (2) on the reinforcing steel bar framework (4), and then fixing the trapezoid component (2) to the reinforcing steel bar framework (4); fourthly, checking the trapezoid component (2) so that the trapezoid component (2) can not be covered with concrete after the concrete is poured on the shear wall body (6), wherein the upper side face of the trapezoid component (2) needs to be flush with the outer side face of shear wall body (6); fifthly, detaching the trapezoid component (2) after the shear wall body (6) is solidified and mold removal is conducted, wherein the trapezoid component (2) can be repeatedly used. By means of the method, material saving and environment protection are achieved, the pipe grooves and the shear wall body are formed through one-time pouring, the trapezoid component can be reused after being detached, and the construction method is suitable for the construction process of fabricated type building prefabricated shear wall components.
Construction method for reserving water feed pipe grooves in prefabricated shear wall
The invention provides a construction method for reserving water feed pipe grooves in a prefabricated shear wall. The method includes the following steps of firstly, manufacturing a trapezoid component (2); secondly, wrapping a layer of draft paper or plastic paper (1) on the outer side of the trapezoid component (2) for standby application; thirdly, placing a reinforcing steel bar framework (4) on a shear wall body (6) after the reinforcing steel bar framework (4) is manufactured, placing the trapezoid component (2) on the reinforcing steel bar framework (4), and then fixing the trapezoid component (2) to the reinforcing steel bar framework (4); fourthly, checking the trapezoid component (2) so that the trapezoid component (2) can not be covered with concrete after the concrete is poured on the shear wall body (6), wherein the upper side face of the trapezoid component (2) needs to be flush with the outer side face of shear wall body (6); fifthly, detaching the trapezoid component (2) after the shear wall body (6) is solidified and mold removal is conducted, wherein the trapezoid component (2) can be repeatedly used. By means of the method, material saving and environment protection are achieved, the pipe grooves and the shear wall body are formed through one-time pouring, the trapezoid component can be reused after being detached, and the construction method is suitable for the construction process of fabricated type building prefabricated shear wall components.
Construction method for reserving water feed pipe grooves in prefabricated shear wall
LIU ZHIZHONG (Autor:in)
24.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for reserving water supply pipe groove
Europäisches Patentamt | 2023
|Prefabricated formwork suitable for shear wall with grooves in side edges
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|