Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for reserving water supply pipe groove
The invention belongs to the technical field of building construction, and discloses a reserved water supply pipe groove construction method which comprises the following steps: manufacturing a water supply pipe groove mold; after binding of the steel reinforcement framework and supporting of the formwork are completed, positioning marking is carried out on the steel reinforcement framework and the formwork so as to determine the installation position of the water supply pipe groove mold, and punching is carried out at the positioning marking position of the formwork; a release agent is brushed on the outer side surface of the water supply pipe groove mold; and the water supply pipe groove mold is fixed to the positioning mark of the mold plate. According to the reserved water supply pipe groove construction method, the accuracy of the reserved position of the water supply pipe groove is guaranteed, the situation that the water supply pipe groove is manually chiseled after the formwork is removed is avoided, and therefore manpower and material resources can be saved, steel bars in a concrete wall cannot be damaged, and the water supply pipe groove can be kept flat and smooth.
本发明属于建筑施工技术领域,公开了一种预留给水管槽施工方法,其中包括以下步骤:制作给水管槽模具;待钢筋骨架绑扎完成以及模板支护完成后,在钢筋骨架和模板上进行定位标记,以确定给水管槽模具的安装位置,并在模板的定位标记处打孔;在给水管槽模具的外侧表面刷涂脱模剂;将给水管槽模具固定于模板的定位标记处。该预留给水管槽施工方法保证了给水管槽预留位置的准确度,也避免了模板拆除之后再通过人工剔凿给水管槽,从而能够节省人力物力,不会对混凝土墙体中的钢筋造成破坏,且给水管槽能够保持平整光滑。
Construction method for reserving water supply pipe groove
The invention belongs to the technical field of building construction, and discloses a reserved water supply pipe groove construction method which comprises the following steps: manufacturing a water supply pipe groove mold; after binding of the steel reinforcement framework and supporting of the formwork are completed, positioning marking is carried out on the steel reinforcement framework and the formwork so as to determine the installation position of the water supply pipe groove mold, and punching is carried out at the positioning marking position of the formwork; a release agent is brushed on the outer side surface of the water supply pipe groove mold; and the water supply pipe groove mold is fixed to the positioning mark of the mold plate. According to the reserved water supply pipe groove construction method, the accuracy of the reserved position of the water supply pipe groove is guaranteed, the situation that the water supply pipe groove is manually chiseled after the formwork is removed is avoided, and therefore manpower and material resources can be saved, steel bars in a concrete wall cannot be damaged, and the water supply pipe groove can be kept flat and smooth.
本发明属于建筑施工技术领域,公开了一种预留给水管槽施工方法,其中包括以下步骤:制作给水管槽模具;待钢筋骨架绑扎完成以及模板支护完成后,在钢筋骨架和模板上进行定位标记,以确定给水管槽模具的安装位置,并在模板的定位标记处打孔;在给水管槽模具的外侧表面刷涂脱模剂;将给水管槽模具固定于模板的定位标记处。该预留给水管槽施工方法保证了给水管槽预留位置的准确度,也避免了模板拆除之后再通过人工剔凿给水管槽,从而能够节省人力物力,不会对混凝土墙体中的钢筋造成破坏,且给水管槽能够保持平整光滑。
Construction method for reserving water supply pipe groove
一种预留给水管槽施工方法
CHEN SHENGQIANG (Autor:in) / JU LIWEI (Autor:in) / YANG BIAO (Autor:in)
13.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Device for reserving water pipe pressing groove in primary structure
Europäisches Patentamt | 2021
|Novel separating groove type hole reserving sleeve construction tool
Europäisches Patentamt | 2020
|Construction method for reserving water feed pipe grooves in prefabricated shear wall
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|