Construction method of watery red sandstone geological underground water level control
The invention provides a construction method of watery red sandstone geological underground water level control. The construction method is characterized by comprising the following steps: 1) construction preparation; 2) deepening design and optimization of a light well point precipitation scheme; 3) installation of a plurality of light well point precipitation devices; 4) running of a vacuum pump, debugging and pumping, and pumping running; 5) layered earthwork excavation and layered precipitation; 6) reducing a cushion layer by several times, reducing a branch pipe and re-debugging the pumping; 7) closing the cushion layer, and continuously precipitating; 8) stopping precipitation of light well point precipitation devices. Specific to the characteristics of high underground water level and big water content of red sand rock, the construction method can well control the excavation depth of every layer in case of softened red sand rock, reduced intensity and disintegrated earthwork for the seepage of underground water since the precipitation is not timely.
Construction method of watery red sandstone geological underground water level control
The invention provides a construction method of watery red sandstone geological underground water level control. The construction method is characterized by comprising the following steps: 1) construction preparation; 2) deepening design and optimization of a light well point precipitation scheme; 3) installation of a plurality of light well point precipitation devices; 4) running of a vacuum pump, debugging and pumping, and pumping running; 5) layered earthwork excavation and layered precipitation; 6) reducing a cushion layer by several times, reducing a branch pipe and re-debugging the pumping; 7) closing the cushion layer, and continuously precipitating; 8) stopping precipitation of light well point precipitation devices. Specific to the characteristics of high underground water level and big water content of red sand rock, the construction method can well control the excavation depth of every layer in case of softened red sand rock, reduced intensity and disintegrated earthwork for the seepage of underground water since the precipitation is not timely.
Construction method of watery red sandstone geological underground water level control
CHEN YICHAO (Autor:in) / LI JUAN (Autor:in) / ZHANG XIN (Autor:in) / JIANG LONGHUA (Autor:in) / CHEN JUN (Autor:in) / SONG KANG (Autor:in) / LI CONG (Autor:in) / JIANG ZHANGZHANG (Autor:in) / ZHAO YUHONG (Autor:in)
08.07.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of water-rich red sandstone geological underground water level control
Europäisches Patentamt | 2020
|Control on tap plugs. Watery wastes
Tema Archiv | 1998
|Regulars - Diary - Watery functions
Online Contents | 2001
Watery excavations for the Sydhavnsgade tunnel
Tema Archiv | 1995
|Underground water level control device for high-water-level silt geology and construction method
Europäisches Patentamt | 2023
|