Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of curve-shaped tower bridge reinforced concrete combining section
The invention relates to a construction method of a curve-shaped tower bridge reinforced concrete combining section, and belongs to the field of construction of roads and bridges. The reinforced concrete combining section is sequentially separated into a T1-1 section, a T1-2 section and a T2 steel structure section from a lower concrete section pier column to the top; then, the concrete section pier column, the T1-1 section, the T1-2 section and the T2 steel structure section are respectively constructed by a certain method. The construction method has the advantages that for the constructed reinforced concrete combining section, the quality control completely meets the requirement of relevant technical specifications; the construction method is simple, the efficiency is high, the construction period is greatly shortened, the cost is reduced, and the economic benefit is obviously improved.
Construction method of curve-shaped tower bridge reinforced concrete combining section
The invention relates to a construction method of a curve-shaped tower bridge reinforced concrete combining section, and belongs to the field of construction of roads and bridges. The reinforced concrete combining section is sequentially separated into a T1-1 section, a T1-2 section and a T2 steel structure section from a lower concrete section pier column to the top; then, the concrete section pier column, the T1-1 section, the T1-2 section and the T2 steel structure section are respectively constructed by a certain method. The construction method has the advantages that for the constructed reinforced concrete combining section, the quality control completely meets the requirement of relevant technical specifications; the construction method is simple, the efficiency is high, the construction period is greatly shortened, the cost is reduced, and the economic benefit is obviously improved.
Construction method of curve-shaped tower bridge reinforced concrete combining section
JIAO YUFENG (Autor:in) / GAO XIAOJUAN (Autor:in) / LIANG BIN (Autor:in) / ZHOU CHANGQING (Autor:in) / WU PENGYAN (Autor:in) / ZHAO RUI (Autor:in)
29.07.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2024
|Special-shaped main tower construction section concrete winter curing method
Europäisches Patentamt | 2023
|Combined bridge tower steel-concrete combined section structure, bridge and construction method
Europäisches Patentamt | 2022
|Special-shaped curve structure steel-concrete combined tower section and manufacturing process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|