Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Provided is a method for operating a triangular stirring drilling machine. When the triangular stirring drilling machine works, a long arm applies power for downward drilling, a rotary motor dives a rotary shaft on the lower portion of a gearbox to rotate through the gearbox, the rotary shaft rotates to drive a stirring head to rotate, a water spraying device sprays high-pressure water, and the stirring head rotates to stir soil and water into mud. The rotary motor drives a round wheel A and a round wheel B on the left side and the right side to rotate at equal speed through the gearbox, and the round wheel A and the round wheel B rotate at the equal speed to drive a triangular pyramid to vertically move with a square rod A and a square rod B as rails through a hinge rod A and a hinge rod B. In the vertical movement process, soil is cut by a plurality of longitudinal tools on the lower portions of three edges of the triangular pyramid, the soil and the water are stirred into the mud through a plurality of transverse tools on three inner corners of the triangular pyramid, and the mud flows out of triangular holes to form triangular holes.
Provided is a method for operating a triangular stirring drilling machine. When the triangular stirring drilling machine works, a long arm applies power for downward drilling, a rotary motor dives a rotary shaft on the lower portion of a gearbox to rotate through the gearbox, the rotary shaft rotates to drive a stirring head to rotate, a water spraying device sprays high-pressure water, and the stirring head rotates to stir soil and water into mud. The rotary motor drives a round wheel A and a round wheel B on the left side and the right side to rotate at equal speed through the gearbox, and the round wheel A and the round wheel B rotate at the equal speed to drive a triangular pyramid to vertically move with a square rod A and a square rod B as rails through a hinge rod A and a hinge rod B. In the vertical movement process, soil is cut by a plurality of longitudinal tools on the lower portions of three edges of the triangular pyramid, the soil and the water are stirred into the mud through a plurality of transverse tools on three inner corners of the triangular pyramid, and the mud flows out of triangular holes to form triangular holes.