Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for determining digging depth of weakly consolidated soft rock roadbed after raining
The invention discloses a method for determining digging depth of a weakly consolidated soft rock roadbed after raining. The method is characterized by comprising the following steps: firstly, testing the optimum water content of weakly consolidated soft rock filler; secondly, paving liquid limit clays on the surface of the weakly consolidated soft rock roadbed before raining and compacting the clays to form a water seal layer, and testing the thickness of the water seal layer; then establishing a relationship model of four influence factors of the water content of the weakly consolidated soft rock roadbed, the thickness of the water seal layer, the depth of the roadbed, the rate of decay and the airing time after raining; and then backstepping and evaluating to determine the depth of the roadbed of the weakly consolidated soft rock roadbed with the optimum water content according to a water content multi-influence factor relationship model established, and further carrying out construction in the next stage after digging the roadbed. The method disclosed by the invention can be used for effectively reducing the infiltration capacity of rain and accurately determining the digging depth of the weakly consolidated soft rock roadbed after raining, so that the work amount is reduced and the construction time is shortened, and the building quality of the weakly consolidated soft rock roadbed can be effectively guaranteed.
Method for determining digging depth of weakly consolidated soft rock roadbed after raining
The invention discloses a method for determining digging depth of a weakly consolidated soft rock roadbed after raining. The method is characterized by comprising the following steps: firstly, testing the optimum water content of weakly consolidated soft rock filler; secondly, paving liquid limit clays on the surface of the weakly consolidated soft rock roadbed before raining and compacting the clays to form a water seal layer, and testing the thickness of the water seal layer; then establishing a relationship model of four influence factors of the water content of the weakly consolidated soft rock roadbed, the thickness of the water seal layer, the depth of the roadbed, the rate of decay and the airing time after raining; and then backstepping and evaluating to determine the depth of the roadbed of the weakly consolidated soft rock roadbed with the optimum water content according to a water content multi-influence factor relationship model established, and further carrying out construction in the next stage after digging the roadbed. The method disclosed by the invention can be used for effectively reducing the infiltration capacity of rain and accurately determining the digging depth of the weakly consolidated soft rock roadbed after raining, so that the work amount is reduced and the construction time is shortened, and the building quality of the weakly consolidated soft rock roadbed can be effectively guaranteed.
Method for determining digging depth of weakly consolidated soft rock roadbed after raining
LIU KAI (Autor:in) / ZHANG MINGWEI (Autor:in) / SUN ZHIBIN (Autor:in) / WANG FANG (Autor:in) / LU LIN (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Method for semi-filling and semi-digging roadbed on soft rock unfavorable geological interface
Europäisches Patentamt | 2024
|Drainage structure for soft rock filling roadbed and construction method of roadbed
Europäisches Patentamt | 2020
|Roadbed compactness water injection type pit digging volume detection device
Europäisches Patentamt | 2022
|Road repairing construction process for filling-digging junction roadbed section
Europäisches Patentamt | 2020
|