Method for semi-filling and semi-digging roadbed on soft rock unfavorable geological interface
The invention discloses a soft rock unfavorable geological interface subgrade semi-filling and semi-digging method in the technical field of subgrade treatment, which comprises the steps of surveying and setting out, subgrade surface cleaning, drainage system arrangement, pond subgrade treatment and bridge and culvert transition subgrade design, and further comprises subgrade semi-filling and semi-digging, subgrade filling test section and subgrade filling. According to the method for semi-filling and semi-digging the roadbed on the soft rock unfavorable geological interface, systematic construction is formed by combining surveying and setting out, roadbed surface cleaning, drainage system arrangement, pond roadbed treatment and bridge and culvert transition roadbed design, and technical support is provided for the method for realizing the semi-filling and semi-digging roadbed on the soft rock unfavorable geological interface; according to the integrated roadbed construction method, the strength and the stability of the constructed roadbed are ensured by utilizing a half-filling and half-digging roadbed method in a complicated environment, and various obtained data can be sorted through various contrast tests and determination to serve as a basis for implementing a scientific filling and compacting process, so that the rapid, quality-guaranteeing and determination integrated roadbed construction method is realized.
本发明公开了路基处理技术领域的一种软岩不良地质交界面半填半挖路基的方法,包括测量放线、路基清表、设置排水系统、过水塘路基处理和桥涵过渡路基设计,该方法还包括有半填半挖路基、路基填筑试验段和路基填筑;该种软岩不良地质交界面半填半挖路基的方法,结合测量放线、路基清表、设置排水系统、过水塘路基处理和桥涵过渡路基设计形成系统性的施工,为在软岩不良地质交界面实现半填半挖路基的方法提供了技术支持,在面对复杂的环境中利用半填半挖路基的方法,不仅保证了施工路基的强度和稳定,也通过各项对比试验与测定,可对所获得的各种数据进行整理,作为实施科学填筑压实工艺的依据,以实现快速、保质和测定的一体化路基施工方法。
Method for semi-filling and semi-digging roadbed on soft rock unfavorable geological interface
The invention discloses a soft rock unfavorable geological interface subgrade semi-filling and semi-digging method in the technical field of subgrade treatment, which comprises the steps of surveying and setting out, subgrade surface cleaning, drainage system arrangement, pond subgrade treatment and bridge and culvert transition subgrade design, and further comprises subgrade semi-filling and semi-digging, subgrade filling test section and subgrade filling. According to the method for semi-filling and semi-digging the roadbed on the soft rock unfavorable geological interface, systematic construction is formed by combining surveying and setting out, roadbed surface cleaning, drainage system arrangement, pond roadbed treatment and bridge and culvert transition roadbed design, and technical support is provided for the method for realizing the semi-filling and semi-digging roadbed on the soft rock unfavorable geological interface; according to the integrated roadbed construction method, the strength and the stability of the constructed roadbed are ensured by utilizing a half-filling and half-digging roadbed method in a complicated environment, and various obtained data can be sorted through various contrast tests and determination to serve as a basis for implementing a scientific filling and compacting process, so that the rapid, quality-guaranteeing and determination integrated roadbed construction method is realized.
本发明公开了路基处理技术领域的一种软岩不良地质交界面半填半挖路基的方法,包括测量放线、路基清表、设置排水系统、过水塘路基处理和桥涵过渡路基设计,该方法还包括有半填半挖路基、路基填筑试验段和路基填筑;该种软岩不良地质交界面半填半挖路基的方法,结合测量放线、路基清表、设置排水系统、过水塘路基处理和桥涵过渡路基设计形成系统性的施工,为在软岩不良地质交界面实现半填半挖路基的方法提供了技术支持,在面对复杂的环境中利用半填半挖路基的方法,不仅保证了施工路基的强度和稳定,也通过各项对比试验与测定,可对所获得的各种数据进行整理,作为实施科学填筑压实工艺的依据,以实现快速、保质和测定的一体化路基施工方法。
Method for semi-filling and semi-digging roadbed on soft rock unfavorable geological interface
一种软岩不良地质交界面半填半挖路基的方法
LI CHUNCHUN (Autor:in) / WANG YADONG (Autor:in) / HU MENGSHENG (Autor:in) / ZHANG YU (Autor:in)
26.04.2024
Patent
Elektronische Ressource
Chinesisch
Unfavorable geological condition roadbed construction method
Europäisches Patentamt | 2023
|Drainage structure for soft rock filling roadbed and construction method of roadbed
Europäisches Patentamt | 2020
|Method for determining digging depth of weakly consolidated soft rock roadbed after raining
Europäisches Patentamt | 2015
|Road repairing construction process for filling-digging junction roadbed section
Europäisches Patentamt | 2020
|